Calculate MOT Type 1 tonnage for sub-bases beneath driveways, patios and sheds. The calculator defaults to a 100mm compacted depth at 2.2 t/m³ and reports tonnes, cubic metres and bag or loose-load quantities.

FreeInstant resultsUK planning data

Advanced calculator

MOT Type 1 Calculator

1

Project setup

Start with a preset or configure everything yourself.

2

Area and shape

Use the shape that most closely matches the area you are covering.

3

Depth and ordering allowance

Depth has a large effect on quantity. Use the finished compacted depth where relevant.

Advanced options
Bag formats

More than one area?

Plan the whole project

Combine areas and layers, then see an order total for each material.

Open project planner →

Converter

Tonnes ↔ cubic metres

1 m³ = — tonnes

Saved locally

Recent calculations

Your recent calculations stay in this browser.

Reference data

Material planning densities

Use supplier product data whenever available. These figures are planning defaults.

MaterialCategoryPlanning densityTypical rangeCompaction

Overview

MOT Type 1 is commonly associated with the former MCHW Series 800 (Clause 803) terminology. The Manual of Contract Documents for Highway Works was restructured in September 2025, so check the current Specification for Highway Works and confirm your project's required depth and material with your contractor.

How the calculation works

Type 1 weight = area (m²) × compacted depth (m) × 2.2 t/m³ planning density, then any ordering and compaction allowances.

At 100mm compacted depth this works out to 0.22 tonnes (220kg) of Type 1 per square metre before allowances; at 150mm it is 0.33 tonnes.

Bag counts divide total kilograms by the bag's printed net weight and round up — most bulk bags are 850kg rather than a full tonne.

Worked example

A driveway 10m × 4m requires 150mm of compacted MOT Type 1.

Area = 40 m². Volume = 40 × 0.15 = 6.0 m³. Weight = 6.0 × 2.2 = 13.2 tonnes.

With a 10% allowance, order about 14.5 tonnes — a full 16-tonne grab load covers it with margin, or 18 × 850kg bulk bags.

MOT Type 1 at a glance

  • Planning density2.20 t/m³
  • Typical range2.00–2.30 t/m³
  • CategorySub Base
  • CompactionOften relevant
  • SourcePlanning midpoint of published UK supplier data (≈2.0–2.3 t/m³ range observed)
  • Reviewed2026-08-16

MOT Type 1 coverage guide

DepthArea per tonneArea per 850kg bagWeight per m²
25mm18.2 m²15.5 m²55 kg
40mm11.4 m²9.7 m²88 kg
50mm9.1 m²7.7 m²110 kg
75mm6.1 m²5.2 m²165 kg
100mm4.5 m²3.9 m²220 kg
150mm3.0 m²2.6 m²330 kg

Assumptions and accuracy

2.2 t/m³ is a planning density for typical limestone Type 1; granite Type 1 and recycled Type 1 sit differently.

A retail bag labelled Type 1 does not automatically meet every project specification — check the certification your project requires.

Structural thicknesses are engineering decisions, not universal rules; confirm the specified layer and quantities with your contractor or supplier.

Planning density values

Use supplier product data whenever available. These figures are planning defaults shared by every calculator on the site.

MaterialCategoryPlanning densityTypical rangeCompaction
MOT Type 1Sub Base2.20 t/m³2.00–2.30 t/m³Relevant
MOT Type 3Sub Base2.10 t/m³1.90–2.20 t/m³Relevant
Recycled Type 1Recycled2.00 t/m³1.80–2.20 t/m³Relevant
6F2 / 6F5 crushed aggregateRecycled2.00 t/m³1.80–2.20 t/m³Relevant
Road planingsRecycled2.00 t/m³1.80–2.20 t/m³Relevant
Sharp sandSand1.60 t/m³1.50–1.70 t/m³Usually no
Building sandSand1.50 t/m³1.40–1.60 t/m³Usually no
Kiln-dried sandSand1.50 t/m³1.40–1.60 t/m³Usually no
10mm pea shingleGravel1.60 t/m³1.40–1.70 t/m³Usually no
20mm gravel / shingleGravel1.60 t/m³1.40–1.70 t/m³Usually no
Decorative gravelDecorative1.50 t/m³1.30–1.70 t/m³Usually no
Slate chippingsDecorative1.60 t/m³1.40–1.80 t/m³Usually no
Gabion stoneGravel1.50 t/m³1.40–1.60 t/m³Usually no
Self-binding gravelGravel1.90 t/m³1.80–2.10 t/m³Relevant
Crushed concreteRecycled1.90 t/m³1.70–2.10 t/m³Relevant
Limestone scalpingsSub Base2.00 t/m³1.80–2.20 t/m³Relevant
BallastSand1.70 t/m³1.60–1.80 t/m³Usually no
Generic aggregateGeneral1.70 t/m³1.50–2.20 t/m³Usually no

How to use this calculator

  • Enter the area to be sub-based and the specified compacted depth (commonly 100-150mm for vehicles).
  • MOT Type 1 is preselected; switch to Type 3, recycled Type 1 or scalpings if specified.
  • Enable the compaction allowance in Advanced options when ordering loose material.
  • Compare bulk bag against loose-load cost using the price fields.

When MOT Type 1 is commonly used

MOT Type 1 is the default graded sub-base under block paving, asphalt, concrete slabs and gravel surfaces. MOT Type 3 is its free-draining cousin for permeable constructions; recycled Type 1 offers a lower-carbon alternative where the specification allows.

Frequently asked questions

How much MOT Type 1 per square metre?

At a 100mm compacted depth allow about 0.22 tonnes (220kg) per m²; at 150mm about 0.33 tonnes. Add your ordering allowance on top.

What depth of Type 1 do I need for a driveway?

Private driveways commonly use 100-150mm compacted, but the required depth depends on subgrade strength and expected loads. Check the specification for your project and confirm with your contractor.

How many bulk bags of Type 1 for 10 tonnes?

Twelve 850kg bulk bags hold 10.2 tonnes. At 800kg per bag you would need thirteen.

Is MOT Type 1 the same as Type 1 sub-base?

The terms are used interchangeably for the graded granular sub-base referenced in UK highway specifications. 'MOT' comes from the former Ministry of Transport; the current reference is the Specification for Highway Works published by Standards for Highways (the MCHW was restructured in September 2025 — Type 1 was formerly specified under Series 800).

What is MOT Type 3?

A coarser, free-draining sub-base with lower fines content than Type 1, used under permeable paving. It plans slightly lighter — around 2.1 t/m³ — and compacts less densely.

Related calculators and guides

References and source notes